Station equipment · functional overview

Pressure-regulation & metering

Identify equipment families before sourcing station components or maintenance replacements.

Pressure-regulation & metering1: Inlet connection & isolation. 2: Filtration. 3: Regulation & safety controls. 4: Metering, where specified. 5: Outlet & maintenance items. Functional groups only, not a P&ID or a complete skid design. A regulating/metering station is not interchangeable with a CNG compression or dispensing installation.Internal safety train not depictedFunctional groups · not a P&IDMetering where specified12345
Illustrative arrangement · drawing notes

Functional groups only, not a P&ID or a complete skid design. A regulating/metering station is not interchangeable with a CNG compression or dispensing installation.

Open full-size drawing ↗

Explore the numbered parts

Choose a number to see its purpose and what to check before buying.

1. Inlet connection & isolation

Inlet piping and isolation connect the assembly to its upstream system.

Check before buying: Confirm the approved drawing, end connections, pressure class, material and isolation requirements.

Find related materials →

Use the project drawing to finalise the BOQ

These guides explain purchasing groups. They do not specify installation dimensions, pressure ratings, quantities or a construction method. The tender and approved drawings decide the exact configuration, applicable approvals and supply responsibilities.

Reference & version

Concept v1 · 31 October 2026. Procurement orientation only; project-specific technical approval is not implied.

Use your station’s approved P&ID, equipment schedule and OEM maintenance documents.