Skip to content
PipedGas CompanyAn Enamun business
← Project guides

Ground Connectivity · indicative underground route

MDPE service connection

See how a service branch relates to the existing main, jointing components and above-ground interface.

MDPE service connection1: Existing main & branch. 2: MDPE service pipe. 3: Jointing & route fittings. 4: Protection & identification. 5: Protected transition. Indicative connectivity only. Route, depth, protection, joining procedure and the GC/LMC scope boundary require the project drawing. No excavation dimensions are shown.Jointing equipment · separate toolUnderground network contextAbove-ground interface12345
Illustrative arrangement · drawing notes

Indicative connectivity only. Route, depth, protection, joining procedure and the GC/LMC scope boundary require the project drawing. No excavation dimensions are shown.

Open full-size drawing ↗

Explore the numbered parts

Choose a number to see its purpose and what to check before buying.

1. Existing main & branch

The service branches from the existing network through the specified tapping or branch fitting. The illustration does not authorise work on a live main.

Check before buying: Confirm main and service diameters, material compatibility and the operator-approved branch arrangement.

Find related materials →

Use the project drawing to finalise the BOQ

These guides explain purchasing groups. They do not specify installation dimensions, pressure ratings, quantities or a construction method. The tender and approved drawings decide the exact configuration, applicable approvals and supply responsibilities.

Reference & version

Concept v1 · 31 October 2026. Procurement orientation only; project-specific technical approval is not implied.

IGL CP18519 technical volume — reference for component families