LMC · from the service interface to the appliance

Domestic PNG connection

Follow the connection, identify the component groups and prepare the right buying questions.

Domestic PNG connection1: Service & transition. 2: GI route & isolation. 3: Meter & control group. 4: Kitchen pipe & gas tap. 5: Connector & appliance. Illustrative low-rise connection. The GC/LMC scope boundary, meter arrangement and pipe route are set by the project drawing and contract. Not to scale.Underground service contextBuilding / kitchen contextArrangement per projectKitchen12345
Illustrative arrangement · drawing notes

Illustrative low-rise connection. The GC/LMC scope boundary, meter arrangement and pipe route are set by the project drawing and contract. Not to scale.

Open full-size drawing ↗

Explore the numbered parts

Choose a number to see its purpose and what to check before buying.

1. Service & transition

The underground MDPE service meets the above-ground installation through the specified transition and protective arrangement. This interface is shown for context; confirm which contractor supplies and installs each part.

Check before buying: Confirm service and outlet sizes, transition type, protection and contractual scope boundary.

Find related materials →

Use the project drawing to finalise the BOQ

These guides explain purchasing groups. They do not specify installation dimensions, pressure ratings, quantities or a construction method. The tender and approved drawings decide the exact configuration, applicable approvals and supply responsibilities.

Reference & version

Concept v1 · 31 October 2026. Procurement orientation only; project-specific technical approval is not implied.

IGL CP18519 technical volume — reference for component families